Showing posts with label Don't Sweat the Small Stuff. Show all posts
Showing posts with label Don't Sweat the Small Stuff. Show all posts

Wednesday, February 3, 2010

February is Here! What Have I Accomplished So Far?


The third and fourth week of January have been a blur because of work. I did most of the tasks I put on my agenda although there were some days when I was just so tired after my shift that I ended up glued in front of the TV watching 24 before going to bed when I should've played with my drums and guitars some more or started looking for an affordable driving school instead of just letting time pass by. Tsk, tsk, tsk.

Anyway, I forgive myself. I'm only human after all. On the other hand, I did start to accomplish some of the things I said I would:
  • I now cook simple recipes more than usual (including Peter's breakfast).
  • I was able to memorize one song with my guitar.
  • I'm getting better with my basic rock drum beat (if I have the time, I'll try to produce a video of myself playing with my instruments just to give me that extra push).
  • I read a few pages of my books when I wake up and before I sleep (Oprah's Live Your Best Life, Don't Sweat the Small Stuff in Love, Archie Comics, Paolo Coelho's Brida, Jack Canfield's Success Principles, Reader's Digest).
Furthermore, I would  like to take this opportunity to thank God and the universe for the additional blessings I  received last month:
  • I went on an 8-day Asian backpacking trip with one of my best girlfriends (we explored Singapore, Vietnam and Kuala Lumpur) and cured my fear of flying in the process.
  • I attended a free NLP (Nuerolinguistic) program in Cebu, all expenses paid (accommodation at Waterfront Hotel, buffet meals, and the free airline tickets).
  • An additional job that provides additional income for us.
And so now, I face February, the second month of the year. I will be changing my routine a bit. Because of my trip to Cebu last weekend, my body clock shifted and I am now working from dawn til  afternoon  and sleeping in the evening instead of working from evening til morning and sleeping in the afternoon. I will maintain my meditation practices, of course, but my workout routine will have to be done after work. The same goes for the other projects that I want to accomplish. This month, I have to start incorporating the following into my weekday schedule and devote less time to DVD watching (good luck to me!):

  • Level 2 of Drums
  • Guitar playing (memorize a new song)
  • Wind Surfing (one weekend)
  • Making Beaded Accessories
  • Biking / Wii / PSP
  • Play Keyboards
  • Tarot Card Reading

This does not mean that I will let go of the other stuff I've already started to accomplish. The way I see my plan is like this: By doing these little projects one by one, a time will come  when all of them will be a natural part of my daily routine. So even if I start doing something new, I will still be cooking, playing with my instruments, making beaded accessories, biking in the afternoon, etc. 

With that I welcome February! May it be filled with accomplishments, joy and more blessings. 

Carpe diem!

Chat soon!


Monday, January 18, 2010

An Experimental Schedule

My second week ended rather nicely. I went to a casting call, spent time with my girlfriends, did a bit of shopping (bought a KECCi backpack for traveling and a Jeep DSLR holster), watched several episodes of 24 and of course, spent some more time bonding with my hubby.

And now, my third week has started so awesomely.

I first woke up at 1:30, Monday afternoon, Philippine time. I drank my Vita Plus veggie juice, I did my meditation, pondered about one of the Para-Grams, ACCOMPLISHMENT, then read 13 chapters of my book, Don't Sweat the Small Stuff In Love by Richard Carlson, Ph.D. At around 2:30 pm, I went back to sleep.


Over the years, I learned to follow the needs of my body. I figured that I've been so used to working in U.S. time (Central Standard Time) therefore it's just right that I go back to sleep so I can function better all throughout the day.

Finally, I woke up at around 6:00 pm (which is only 4:00 AM CST), more alert and energetic than ever. In six hours, I was able to accomplish the following:


  • Did some rounds of kickboxing.
  • Did 20 minutes of yoga afterwards.
  • Cleaned around the house a bit.
  • Had some fruits.
  • Did a bit more research on trips I want to do this year.
  • Took a shower.
  • Prepared a healthy breakfast --- Tuna and Vegetable Sandwich & a Hot Pot of Green Tea.
  • Played with my drums. For the first time, I used my new pair of Vic Firth drum sticks which were Bim's Christmas gift to me two Christmases ago. Hihihi. They're quite heavy for me. My old Zildjian sticks are a lot lighter and for now, I play better with them. ^_^
  • Memorized a song with my guitar. Yipee! My thumbs are aching though. I need to practice regularly.
  • Read a few pages of Paolo Coelho's book, Brida.
  • Then I logged in for work, blogged a bit at Kicking Pinay and checked my social networks.
  • While working, I was able to use my Foot and Back Massager w/ Infrared Heat; I was able to finish uploading all the songs I love on my iTunes and right now I am using my Slender Shaper. You see I got so many stuff  I purchased impulsively in the past and which I never really use. So all that will change by not purchasing something I don't really need and using those that I already have. Good plan, right?
Anyway, I consider all these things very productive. On any ordinary day, I would've just spent those hours surfing the net about trivial stuff and watching 24 or one of my TV series/DVD movies..  totally unproductive as compared to what I have accomplished today so far.

It's now 5:30 AM (Philippine time) / 3:35 PM (Central Standard Time). I'm halfway through my job and currently taking a break by blogging about what I have accomplished so far.

When I log out later, I plan to water the plants, do some tarot card reading, read more of Brida  and say a prayer of gratitude before I go to sleep. ^_^

I feel so good about today that I may be using this kind of schedule from now on, or at least this week... until I get bored with it. The important thing is for me to be able to do a bit of everything that I set out to accomplish for this year and stop doing other mindless and unproductive stuff. Amen.

Chat soon!


Related Posts with Thumbnails